For a standard 3-bedroom bungalow/flat, the foundation cost (from excavation to DPC level) commonly falls between ₦1,800,000 and ₦6,000,000 in Nigeria as of 2025-2026.
The wide range reflects the foundation type (strip footing vs raft vs pile), soil condition, quality of materials (cement, granite, sand, reinforcement), labour rates, and regional logistics.
Think of the foundation as the house’s spine; under-budgeting it causes pain later.
Below I break the numbers down so you can plan with clarity.

Quick price overview: Typical range (2025-2026)
Table: Typical Foundation Cost for a 3-Bedroom Flat (Nigeria, ₦)
| Foundation Type | Typical Price Range (₦) | When used |
| Shallow strip footing (good soil) | ₦1,800,000 – ₦3,200,000 | Normal soils, 1–2 storey buildings. |
| Raft foundation (poor/soft soil) | ₦3,500,000 – ₦6,000,000 | Sandy/cohesionless/loose soils or coastal/Lekki. |
| Pile foundation (very weak soil or heavy loads) | ₦6,000,000+ | Expensive sites, waterlogged or high rise. |
Why the range is wide: three main drivers
- Soil & geotech requirements: If a site needs a raft or piles, cost jumps immediately. Geotechnical tests (soil boring) often force design upgrades.
- Material price volatility: Cement, steel, and aggregate prices rose sharply in 2024–2025; a 50kg bag of cement is now commonly ₦8k–₦10.5k depending on brand and city. That feeds into concrete and blockwork costs.
- Labor / logistics / city premium: Lagos & Port Harcourt carry higher transport and labour premiums than Ibadan or Kano. Bulk buying and proximity to quarries lower costs.
Typical foundation types explained (so you know what you’re paying for)
1) Strip footing (shallow foundation) most common for 3-bedroom flats
- What it is: Continuous reinforced concrete trenches under load-bearing walls.
- When used: Stable, compacted soils with good bearing capacity.
- Why cheaper: Less concrete and reinforcement than raft/piles.
- Typical cost for a 3-bedroom flat: ₦1.8M – ₦3.2M (materials + labor to DPC).
2) Raft (mat) foundation
- What it is: A large concrete slab under the whole building, distributing load across weak soils.
- When used: Loose sands, high water table, or when loads are spread (e.g., larger buildings).
- Typical cost: ₦3.5M – ₦6.0M for a typical 3-bedroom footprint in Nigeria; depends heavily on thickness, reinforcement, and site prep.
3) Pile foundation (deep foundation)
- What it is: Concrete or bored piles driven or cast to firm strata, with a pile cap and ground beams.
- When used: Coastal Lekki, reclaimed land, waterlogged sites, or heavy loads.
- Typical cost: ₦6M+: can quickly escalate into tens of millions depending on depth, pile type, rig mobilization, and number of piles.
Detailed cost breakdown: Materials & labor (typical strip footing to DPC)
Below is a sample, realistic itemized breakdown for a strip footing for a 3-bedroom flat (numbers are examples/averages, use local quotes for precision).
Sample scope: excavation; concrete blinding; 1:2:4 concrete strip footing (150–300mm thick) reinforced with steel; foundation blocks or blockwork to DPC; DPC membrane; backfill & compaction.
Materials (approx, aggregated)
- Cement (50kg): 60–120 bags for foundation stage (depends on mix and volume). Price per bag: ₦8,000 – ₦10,500. (Total cement cost: ₦480,000 – ₦1,260,000).
- Steel reinforcement (bars): quantity depends on design; ballpark: ₦200,000 – ₦600,000. Megalabourers cite rising rod prices affecting budgets.
- Sharp sand & granite (aggregate): several tipper loads; total ₦400,000 – ₦1,200,000 depending on distance & quantity.
- Blockwork (for strip fill / up to DPC): blocks and mortar: ₦200,000 – ₦600,000 (depends on block size and local unit cost).
- DPC membrane & waterproofing: ₦30,000 – ₦120,000.
- Misc (binding wire, nails, timber for formwork, fuel for mixers): ₦50,000 – ₦200,000.
Labor & plant
- Excavation & site prep (labour + manual shovel / small excavator): ₦60,000 – ₦400,000 depending on depth and whether mechanical excavation is used.
- Concrete pouring, reinforcement fixing, blocklaying, and finishing: labor for skilled and unskilled teams: ₦300,000 – ₦1,200,000.
- Transport (materials): can add ₦100,000 – ₦500,000 depending on distance and number of trips.
Combined sample total (strip footing): adding the ranges above gives the previously cited ₦1.8M – ₦3.2M realistic band.
These numbers align with practical estimates published for foundations to the DPC level.
Check out the Stone Coated Roofing Sheet Price in Nigeria
Foundation for different cities: Regional guides
- Lagos (Lekki, Victoria Island, Ajah): Expect a premium: strip footing ₦2.5M – ₦4.5M; raft ₦4M – ₦8M. Coastal and reclaimed sites often need raft or piles; rig mobilization raises cost.
- Ibadan: Generally cheaper due to quarry proximity and lower transport costs: strip ₦1.6M – ₦2.8M; raft ₦3M – ₦5M. If soil is stable, savings are real.
- Abuja: Mid-range: strip ₦2.0M – ₦3.5M; raft ₦3.5M – ₦6M. Soil testing often required for government approvals. listedbyowners.com.ng
- Port Harcourt / Warri: higher logistics and demand: similar to Lagos or slightly higher depending on supply chain.
Steps you should budget for (practical timeline & costs)
- Soil test / geotechnical investigation: ₦100,000 – ₦600,000 depending on number of boreholes and lab tests. Don’t skip this: wrong foundation choice costs more later.
- Site clearing & topsoil removal: ₦30,000 – ₦200,000.
- Excavation: manual vs machine; mechanical costs more but speeds delivery. Budget accordingly.
- Blinding concrete & reinforcement: material and labor as shown earlier.
- Strip footing / raft / pile construction: main cost bucket.
- Blockwork to DPC: adds material and labor costs.
- Backfilling, compaction & drainage: often underestimated; budget ₦50k–₦300k.
- Testing & curing period: quality checks and curing (labour & water): small but important cost.
Practical examples & case studies (realistic scenarios)
- Cheap-but-risky site (no geotech tested, shallow strip): Materials bought cheaply, labor casual: foundation cost may be ₦1.6M, but risk of settlement/rework exists. Not recommended.
- Proper approach (soil test + engineered strip footing): Geotech + designed footing + quality concrete → ₦2.4M – ₦3.2M; more upfront but far cheaper than repairs.
- Coastal / Lekki reclaimed lot (raft or piles): Geotech shows poor bearing → raft foundation ₦4.5M – ₦7M, or piles ₦8M+ depending on depth and pile count. Mobilization of pile rig drives cost.
Factors that cause sudden cost jumps (watch out)
- Cement spikes, a ₦2,000 rise per bag across the foundation stage, multiply quickly.
- Steel price volatility and reinforcement cost is a big lever in concrete foundations.
- Unexpected rock or water at excavation may require rock breaking or dewatering, adding hundreds of thousands of naira.
- Design change mid-work, altering beam widths or footing depth multiplies cost.
- Delays & bad contractor management idle plant, longer hire, and overtime labour inflate budgets.
How to save money wisely (don’t cheap out on structural parts)
- Do the soil test; it pays for itself. Designing for actual soil saves over-design or surprise deep foundations.
- Buy bulk and schedule deliveries, batching cement and aggregate reduces transport overhead.
- Use an experienced structural engineer, a right-sized design avoids over-reinforcement or under-designed repairs later.
- Negotiate fixed-price scopes for the foundation phase to limit exposure to material spikes. But ensure the contract allows for transparent variation clauses.
- Inspect materials on delivery; low-grade cement or undersized bars will haunt you later.
- Hire a reliable contractor with references; poor workmanship causes repairs that cost far more than slight savings on labor rates.
FAQs: Cost of Foundation for 3 Bedroom Flat in Nigeria
Q: How much is the foundation for a 3-bedroom flat in Lagos?
A: For a normal site in Lagos, expect ₦2.5M – ₦4.5M for a strip or raft to DPC; reclaimed or soft land requiring piles will be significantly higher.
Q: Does the foundation cost include blockwork to DPC?
A: In these estimates, yes, the “to DPC” scope (blocks up to damp proof course) is included. Confirm the scope with your contractor.
Q: Is a soil test really necessary?
A: Yes. A borehole + basic lab tests (spt, Atterberg if needed) prevent under-design and surprise works, saving money in the long run. Typical geotech costs are ₦100k – ₦600k.
Q: Can I use cheaper cement brands to cut cost?
A: Short-term saving, long-term risk. Use reputable cement brands and check batch numbers; low quality reduces concrete strength and may cause structural issues.
Q: How long does foundation work take?
A: For a 3-bedroom strip footing: 2–4 weeks (excavation, reinforcement, pour, blockwork). Raft and piled foundations take longer, depending on curing & pile rig availability.
Final summary & action checklist
- Short answer: Budget ₦1.8M – ₦6.0M for the foundation of a 3-bedroom flat in Nigeria. The exact number depends on soil, foundation type and city.
- Do this now: Order a geotechnical test (if you haven’t), get at least 3 detailed quotes (engineered drawings + schedule), and insist on a fixed price for the foundation stage with clear variation clauses.
- Protect yourself: Require material delivery receipts, a warranty on workmanship, and staged payments tied to completed milestones.
Trust me on this: get the foundation right. It’s the cheapest insurance you’ll buy for your home.